Decisions
Renovate all at once, or in phases?
The trade-offs between one big project and several smaller ones.
If more than one room needs work, you have a choice: do it together, or one project at a time. Both can work. One mistake to avoid applies to both.
All at once
- Shortest total time under construction.
- Trades come through once: one round of electrical, plumbing, drywall and paint.
- Floors and finishes run through without seams or mismatches.
- Higher cost up front, and you may need to move out for part of it.
In phases
- Spreads the cost over time.
- You can usually stay in the house.
- Longer overall, with repeated disruption.
- Some work is done twice, such as patching and painting where phases meet.
The mistake to avoid
Designing each phase when you reach it. A kitchen finished in year one can be in the way of an addition in year three. Design the whole house first, then decide the order. The master plan costs little and saves undoing finished work.
A sensible order when phasing
- Anything structural or behind walls: wiring, plumbing, insulation.
- The messiest rooms: kitchen, then bathrooms.
- Additions and basement.
- Floors, trim and paint through the remaining rooms.
- Outdoor work.
Keep reading
All guides-
Kitchen remodel planning guide
What to decide first, what shapes the cost and how the work is sequenced.
Read the guide -
Bathroom remodel planning guide
Layout, wet areas, tile and the order the work happens in.
Read the guide -
Finishing a basement: what to know first
Moisture, ceiling height, egress and the choices that make a basement feel like part of the house.
Read the guide
Ready to talk about your project?
Book a free design consultation at our Schaumburg showroom or at your home.
-
One dedicated designer
The same person from the first plan to the final walkthrough.
-
Schaumburg showroom
See cabinets, stone, tile and flooring in person before anything is ordered.
-
Backed by warranty
A lifetime warranty on most products, and one year on our labor.