Free design consultation at our Schaumburg showroom or at your home. Book now

Planning

Bathroom remodel planning guide

Layout, wet areas, tile and the order the work happens in.

Primary bathroom with a long grey vanity and a soaking tub, remodeled by CabinetLand

A bathroom is the smallest room in the house and one of the most complicated to build. Here is how to plan one so the finished room works as well as it looks.

Decide what moves

Keeping the toilet, shower and vanity where they are is the single biggest saving in a bathroom. Moving a toilet means moving a large drain; moving a shower means new supply, drain and waterproofing. Sometimes it is worth it, for instance to fit a larger shower or a double vanity, but decide it deliberately.

Tub, shower or both

  • A walk-in shower uses the room best if nobody in the house takes baths.
  • Keep at least one tub in the house if you have young children or may sell to a family.
  • A curbless shower is easier to use at any age, and needs the floor planned for it from the start.
  • A freestanding tub needs more floor area than its footprint suggests, for cleaning around it.

Waterproofing is the part you never see

Tile and grout are not waterproof. What keeps water out of the walls is the membrane or board system behind the tile, and the slope of the shower floor to the drain. It is the least visible part of the job and the one that matters most for how long the bathroom lasts.

Choose tile with the layout in mind

Large-format tile means fewer grout lines and a calmer look, but needs flatter walls and floors. Small tile and mosaics follow a sloped shower floor more easily and give better grip. Pick the floor first, then walls, then any accent.

Do not skip ventilation and lighting

A properly sized, quiet exhaust fan vented to the outside protects everything else you have paid for. For lighting, put light at face level on both sides of the mirror rather than only overhead, and add a separate light in the shower.

The order of work

  1. Demolition and any framing changes
  2. Rough plumbing and electrical
  3. Inspection, where the town requires one
  4. Wall board and waterproofing
  5. Tile, then grout
  6. Vanity, top, toilet and fixtures
  7. Glass, mirrors, paint and hardware

Keep reading

All guides
  • Converting a tub to a walk-in shower

    What a tub-to-shower conversion involves and what to decide before you start.

    Read the guide
  • Kitchen remodel planning guide

    What to decide first, what shapes the cost and how the work is sequenced.

    Read the guide
  • Finishing a basement: what to know first

    Moisture, ceiling height, egress and the choices that make a basement feel like part of the house.

    Read the guide

Ready to talk about your project?

Book a free design consultation at our Schaumburg showroom or at your home.

  • One dedicated designer

    The same person from the first plan to the final walkthrough.

  • Schaumburg showroom

    See cabinets, stone, tile and flooring in person before anything is ordered.

  • Backed by warranty

    A lifetime warranty on most products, and one year on our labor.

Book a consultation Call us