Planning
Kitchen remodel planning guide
What to decide first, what shapes the cost and how the work is sequenced.
Most of what decides whether a kitchen remodel goes well happens before any work starts. This guide walks through the decisions in the order they need to be made.
Start with what does not work
Before looking at door styles, write down what frustrates you about the kitchen today. Not enough counter beside the range, nowhere to put the bins, two people cannot pass, the room is dark. A remodel that fixes those is a success whatever colour the cabinets are.
- Who cooks, and how many at once
- What you store, and what never has a home
- Whether you eat in the kitchen
- What you would keep exactly as it is
Decide how far the layout changes
There are three levels of kitchen remodel, and the choice between them drives the budget more than any finish.
- Replace in place: new cabinets, countertops and finishes on the existing layout. Plumbing and walls stay put.
- Rework the layout: move the sink or range, add an island, change a doorway. Plumbing, gas, venting and electrical move with them.
- Open or extend: remove a wall to the family room, or add on. This brings structure and permits into it.
Choose in the right order
Selections depend on each other, so the order matters.
- Layout and appliances, because appliance sizes set the cabinet plan.
- Cabinets: line, door style and finish.
- Countertops, chosen against the cabinet finish.
- Backsplash, chosen against the countertop.
- Flooring, lighting, hardware and paint.
Seeing the cabinet door, the stone and the tile side by side is the surest way to avoid a combination that only worked in separate photos. That is what a showroom visit is for.
Know how the work is sequenced
A typical kitchen runs: demolition, rough plumbing and electrical, drywall repair, flooring (depending on the type), cabinets, countertop measure, countertop installation, backsplash, final plumbing and electrical, paint and punch list. Countertops are measured only after the cabinets are in, so a short pause there is normal.
CabinetLand, our parent company, puts most kitchen remodels at about 4 to 8 weeks once installation starts, after 2 to 6 weeks of design and ordering.
Plan for living without a kitchen
Set up a temporary kitchen in another room before demolition: the old refrigerator, a microwave, a kettle and a place to wash up. Our guide to living through a remodel has a checklist.
Keep reading
All guides-
Kitchen layouts explained
Galley, L-shape, U-shape, island and peninsula: which suits which room.
Read the guide -
Bathroom remodel planning guide
Layout, wet areas, tile and the order the work happens in.
Read the guide -
Finishing a basement: what to know first
Moisture, ceiling height, egress and the choices that make a basement feel like part of the house.
Read the guide
Ready to talk about your project?
Book a free design consultation at our Schaumburg showroom or at your home.
-
One dedicated designer
The same person from the first plan to the final walkthrough.
-
Schaumburg showroom
See cabinets, stone, tile and flooring in person before anything is ordered.
-
Backed by warranty
A lifetime warranty on most products, and one year on our labor.